Excavations 2023


This is a temporary blog for presenting the excavations at Perdigões. Posts from 2011 to 2022 are available.

Thursday 12 April 2018

0242 - Day 10 / Dia 10



Enlarging the excavation to get all the chamber.
Alargando a escavação para abranger toda a câmara.


Defining the ploughing marks in the new area.
Definindo as marcas da surriba na nova área.


A visit in the afternoon from another Era team. A great help.
Uma visita à tarde de outra equipa da Era. Uma grande ajuda.


And the chamber is becoming more perceptible.
E a câmara começa a ficar mais perceptível.


And we start to understand the construction procedures: first a circular excavation of the bedrock, then a coating of clay and small stones, and finally a dry-stone wall of schist. Different from the other two tholos type structures already excavated at Perdigões
E começamos a perceber os procedimentos de construção: primeiro a escavação circular do geológico, depois um revestimento a argila com pequenas pedras, finalmente a parede de pedra seca em xisto. Diferente das duas outras estruturas tipo tholos excavadas nos Perdigões

No comments:

Post a Comment