Excavations 2023


This is a temporary blog for presenting the excavations at Perdigões. Posts from 2011 to 2022 are available.

Friday 6 April 2018

0238 - 5th day / Quinto dia


This is the image of how a deep ploughing can affect an archaeological structure, in this case a tholos. Nevertheless, we are starting to get an image of the structure between the ploughing trenches: a glimpse of the eastern limits of the walls of the circular chamber and of the alignment of the entrance corridor. Some indicators suggest that, at the base, we might get all the structure preserved.
A side, today we had tourists that came from Lisbon to specifically visit Perdigões and Esporão.

Esta é a imagem de como uma lavra profunda afecta uma estrutura arqueológica, neste caso um Tholos. Contudo, começamos a ter uma noção da estrutura entre as valas da surriba: a perspectiva dos limites Este da câmara circular e do alinhamento do corredor de acesso. Alguns indicadores sugerem que, ao nível da base, poderemos ter toda a estrutura preservada.
À parte, hoje tivemos a visita de alguns turistas vindos de Lisboa especificamente para visitar os Perdigões e o Esporão.




No comments:

Post a Comment