Excavations 2024


This is a temporary blog for presenting the excavations at Perdigões. Posts from 2011 to 2023 are available.

Wednesday, 16 July 2014

047 – With all areas in work


We are now with the full team and with all areas in work.
 
 
Sector Q
 
 
Sector P.
 
Sector O. Opening a new survey area by removing the ploughed layer.
 
In sector Q, with the enlargement of the excavated area to North, is now clear the development of the Late Neolithic ditches, later cut by the Chalcolithic large circular feature in which filling deposits the pits with cremated remains were opened.
 
 
Ditch 5 cut by the chalcolithic features, in the area of pit 40 (the one with cremated remains).
 
And in that same area some new pits are now under excavation.

 
Excavating a new pit.

No comments:

Post a Comment